ROAD NOTICE UPDATES FOR THE WEEK OF SEPTEMBER 11
While this list encompasses numerous closures in Fishers, it does not list all DPW projects throughout the city.All construction activities are weather permitting and could change. Plan for extra travel time in construction zones and drive distraction free. We appreciate motorists’ patience and caution while driving through construction sites.
state road 37 logo
STATE ROAD 37 AND 141ST STREET
A pre-construction phase at SR 37 & 141st Street is currently in place. During this phase, 141st Street will be a Right-In-Right-Out (RIRO) traffic configuration. 
This is not the permanent configuration. This will allow for traffic to flow more freely along SR 37 until the next phases of construction can be activated. This will eliminate backups along SR 37 that have caused dangerous stops to the free flow traffic and backups on the 146th Street interchange. Again, this is not the permanent configuration for 141st Street. The full timeline for the 141st Street interchange will be provided after project bids are accepted in the Spring 2024.

To navigate the merge, remember:
Use the accel lane to gain speed, not stopUse your mirrors and pay attentionLook for a gap in SR 37 traffic and safely merge
Clear Path logoCLEAR PATH IMPROVEMENT PROJECT

I-465 & I-69
Drivers will see an increase in construction along the I-69 corridor in the coming months. This work will focus on reconfiguring the interchange at I-465 and I-69. New ramps will provide direct movements from eastbound I-465 and northbound I-465 to northbound I-69. Binford Blvd. will also be reconstructed to separate local traffic from traffic entering and exiting I-69 and I-465. Access to I-69 from Binford Blvd. will remain open. 


NICKEL PLATE TRAIL
The City of Fishers has completed the Fishers portion of the Nickel Plate Trail between Hague Road and 106th Street. Coordination and planning are underway with Indianapolis for the final phase between Hague Road and the crossing of 96th Street.  
PROJECTS NORTH OF 116TH STREET 
CUMBERLAND ROAD
There are daily lane closures currently on Cumberland Road, just south of 126th Street for sanitary and water line work. The northbound right turn lane and the southbound passing blister will be closed.146TH STREET & ALLISONVILLE ROAD – HAMILTON COUNTY PROJECT Phase 2A traffic restrictions are in effect. These restrictions eliminate left turn movements from 146th Street onto Allisonville Road and reopen to two through lanes on eastbound and westbound 146th Street. 

Utility relocation work is ongoing.  Periodic lane closures may be necessary to complete this work.  Please watch for flaggers and workers in and around the construction zone.  Construction crews are continuing to work on storm sewer installation and roadway grading.  Crews have begun working on the widening of the westbound bridge over the White River.  The contractor has installed cofferdams and delineating buoys in the White River for pier construction.  Please use caution if canoeing or tubing through the work zone.  

126TH STREET & PROMISE ROAD
On Monday, Sept. 11th and Tuesday, Sept. 12th, westbound 126th Street at Promise Road will have lane restrictions in place between 9 am and 3 pm to allow contractors to repair the railing near the bridge.

TANGLEWOOD ROAD RESURFACING
Weather permitting, DPW crews will be resurfacing Federal Place in Tanglewood subdivision Wednesday, Sept. 13th through Friday, Sept 15th.  Parking restrictions along Federal Place will be in place during this time. 
PROJECTS SOUTH OF 116TH STREET
106TH STREET & ALLISONVILLE ROAD
There is a sanitary sewer project currently taking place at Metro Airport at 106th Street & Allisonville Road. There are times where lane restrictions may be in place on Allisonville Road. Please use caution in this area. 

106TH STREET & HOOSIER ROAD

The intersection of 106th Street and Hoosier Road is closed for the construction of a roundabout.  Access into and out of Windermere subdivision will be on Geist Road via Governors Lane. GEIST GREENWAY
Geist Greenway is open between Valley Crossing to 126th Street! Work has resumed on the trail south of Valley Crossing Drive and will remain closed until construction is finished. Construction continues to take place along Florida Road between Bowline Drive and 104th Street.

106TH STREET TRAIL RESTRICTIONS
The multipurpose trail on 106th Street from Allisonville Road to Hague Road will be restricted with temporary closures from August 22nd to September 12th for maintenance.
2023 RESURFACING PROJECT
ADA ramp and curb reconstruction has begun in the Harrison Parks and Harrison Lakes as part of the 2023 Resurfacing Project. These areas will be restored with topsoil and seed. It is the responsibility of the homeowner to water the seed for the seed to germinate. Prior to road resurfacing, residents will be notified via street signage for street parking restrictions.  Road resurfacing has begun in The Parks at White River and The Bristols

GEIST HALF MARATHON & 5KThe Geist Half Marathon & 5K is just around the corner on Saturday, September 16!  Road closures and restrictions will be in effect around Geist Reservoir beginning at 4 a.m. on September 16 and will continue throughout the morning.  Please note that the following closures and restrictions are subject to change as we near race day.   Course marshals will do their best to allow vehicles through when there is a break in the runner.  However, these breaks cannot be guaranteed so we encourage you to seek an alternate route.